Top Footwear Finds:Stretch,Anti-Microbial&Custom Fit Styles
Top Footwear Finds:Stretch,Anti-Microbial&Custom Fit Styles Top Footwear Finds:Stretch,Anti-Microbial&Custom Fit Styles
Home Massage Shoes Anti-Microbial Mass Shoes
Troy Lee Designs FLOWLINE SE Helmet with MIPS - White

Troy Lee Designs FLOWLINE SE Helmet with MIPS - White

$ 28.55

$ 0.00

Save: $

Size:
  • XS/S
  • M/L
  • XL/XXL
Unavailable
Please select combo product attributes
The combo subtotal is $,SAVE$

Product Details

Troy Lee Designs FLOWLINE SE MIPS Helmet Stealth - White

The all-new Flowline SE Helmet is handpicked, literally, by the pros and for good reason. The Flowline SE Helmet features all the same marquee accolades as the Flowline Helmet including an NTA 8776 E-Bike Certification and Virginia Tech 5-Star Safety rating but with upgrades. Premium details like a fidlock® magnetic buckle, Anti-Microbial Quick Dry comfort liner, dual density EPS and more make Flowline SE the premium choice for any rider looking to hit their local trails or cruise the streets on their e-bikes.

SPECIFICATIONS
  • 3-Way adjustable screwless visor
  • NTA-8776 certified for E-Bike usage
  • MIPS B-Series Rotational Impact Brain Protection System
  • Full 360-degree fit retention system with 3-way rear height adjustment
  • 14 vents for maximum airflow
  • Full wrap in-mold construction
  • Extended Coverage MTB Trail Helmet
  • Fidlock® Magnetic Buckle System
  • Dual Density EPS for low and high-speed impacts
  • Anti-microbial Quick Dry Premium Liner
  • Side strap adjusters
  • 5-Star Virginia Tech safety rating

You May Also Like

Wall Mount Heated Towel Rail
Wall Mount Heated Towel Rail

$ 67.19

Save: $

PALOMA BIKINI TOP SERPENT
PALOMA BIKINI TOP SERPENT

$ 24.50

Save: $

Cap Heated Beanie
Cap Heated Beanie

$ 22.60

Save: $

French Terry - Woodrose $15.25/yd
French Terry - Woodrose $15.25/yd

$ 10.68

Save: $

Brief Prevail Breath Xl 15Ea/Pk
Brief Prevail Breath Xl 15Ea/Pk

$ 18.40

Save: $

emme Navy
emme Navy

$ 94.00

Save: $

French Terry Tie Dye - Plum / Indigo / Ivory $11.49/yd
French Terry Tie Dye - Plum / Indigo / Ivory $11.49/yd

$ 8.04

Save: $

Beast Hyper Fuse Shoes For Men
Beast Hyper Fuse Shoes For Men

$ 28.62

Save: $

E - TRC S-TECH CNC FRONT SHOCK SNIPER 155 (GOLD)
E - TRC S-TECH CNC FRONT SHOCK SNIPER 155 (GOLD)

$ 41.94

Save: $

Attwood Mooring Snubber Kit with 3/8" x 20 Dock Line [11730-7]
Attwood Mooring Snubber Kit with 3/8" x 20 Dock Line [11730-7]

$ 13.29

Save: $

Cart
Top Footwear Finds:Stretch,Anti-Microbial&Custom Fit Styles
Your cart is currently empty.