Top Footwear Finds:Stretch,Anti-Microbial&Custom Fit Styles
Top Footwear Finds:Stretch,Anti-Microbial&Custom Fit Styles Top Footwear Finds:Stretch,Anti-Microbial&Custom Fit Styles
Home Orthopedic Shoes Anti-Microbial Ortho Shoes
TLD Flowline SE Mips Helmet - Radian Camo Grey/Army Green -

TLD Flowline SE Mips Helmet - Radian Camo Grey/Army Green -

$ 39.21

$ 0.00

Save: $

Size:
  • M/L
  • XL/XXL
Unavailable
Please select combo product attributes
The combo subtotal is $,SAVE$

Product Details

Be sure to stay safe on your bike rides with the Flowline SE Helmet from Troy Lee Designs. This half-shell helmet seamlessly combines safety, comfort and style. Enjoy reliable impact absorption and a breathable airflow system with the helmet's design. Plus, the easy-to-use magnetic buckle ensures a secure closure every time. Conquer the mountain bike trails, or city streets, with the Troy Lee Designs Flowline SE Helmet.

SPECIFICATIONS

  • 3-Way adjustable screwless visor
  • MIPS B-Series Rotational Impact Brain Protection System
  • Full 360-degree fit retention system with 3-way rear height adjustment
  • 14 vents for maximum airflow 
  • Full wrap in-mold construction
  • Extended Coverage MTB Trail Helmet
  • Fidlock® Magnetic Buckle System
  • Dual Density EPS for low and high-speed impacts
  • Anti-microbial Quick Dry Premium Liner
  • Side strap adjusters 

You May Also Like

Ocean maze seastar tassel earrings
Ocean maze seastar tassel earrings

$ 46.90

Save: $

Anti-Aging Therapy Moisturizing Repairing Safflower Oil Kit 4 Products - Sillage
Anti-Aging Therapy Moisturizing Repairing Safflower Oil Kit 4 Products - Sillage

$ 31.39

Save: $

Plinth Model 501 Paediatric Tilt Table | Electric Version
Plinth Model 501 Paediatric Tilt Table | Electric Version

$ 45.86

Save: $

Gender Fluid Chest Compression Binder Black Large
Gender Fluid Chest Compression Binder Black Large

$ 24.50

Save: $

Two Pieces Homecoming Dresses,Short Prom Dresses For Teens, SH268
Two Pieces Homecoming Dresses,Short Prom Dresses For Teens, SH268

$ 44.19

Save: $

HJC F70 Carbon Helmet Large
HJC F70 Carbon Helmet Large

$ 48.40

Save: $

Vitamina C Liposomal de mayor absorción a las células, 96%, incluye la cantidad adecuada de colina de fosfatidilo (PC)
Vitamina C Liposomal de mayor absorción a las células, 96%, incluye la cantidad adecuada de colina de fosfatidilo (PC)

$ 42.34

Save: $

1975-1978 GMC C25 Suburban Inserts on Cardboard w/Vent Flooring [Door Panel]
1975-1978 GMC C25 Suburban Inserts on Cardboard w/Vent Flooring [Door Panel]

$ 53.20

$ 69.16

Save: $

CCM SX6000 Socks - SR 30"
CCM SX6000 Socks - SR 30"

$ 27.30

Save: $

Allo Ultra 2500 Disposable - Frost
Allo Ultra 2500 Disposable - Frost

$ 18.19

Save: $

Cart
Top Footwear Finds:Stretch,Anti-Microbial&Custom Fit Styles
Your cart is currently empty.